For a loo redesign that reconfigures the design, provides plumbing lines, and upgrades air flow
https://www.4shared.com/s/fTKF9UEIbjq
For a bathroom rework that reconfigures the structure, provides plumbing strains, and upgrades air flow, count on four to 6 weeks from demolition to remaining inspection and cleanup.